  • Project was completed for an offshore oil field with Triassic sandstone reservoirs.
  • Evaluated work-over and infill drilling opportunities for a reservoir with a single production well.
  • Evaluated water source in a production well with 90% water cut, estimated remaining reserves, and concluded that minimal value was left in the completed reservoir zone.
  • Developed a proposal to isolate the existing zone’s water production, and add perforations in a shallow reservoir zone.
  • Constructed a Mbal reservoir history match model, and matched RFT pressures, static BHP pressures and production rates.
  • Constructed Prosper well and Gap pipeline models to evaluate the impact of work-over intervention volumes on existing production in commingled pipeline.
  • Generated well-bore and incremental profiles from Gap models.
  • Used PEEP to complete economic assessment and estimated NPV, P/I, DCFR and payback period.
  • Presented to management, and passed gate reviews.
  • Secured final investment approval to spend 24 MMUSD capital cost, and added 38 MMUSD NPV.
  • Work-over project delivered 6000 stb/d oil production and isolated 8000 stb/d water production.